Barber Lake Switch

Named in 2 listed projects in ERCOT’s transmission project tracking workbook. First named in the release with data as of July 13, 2026.

—county as printed
138kV
ONCORutility
2projects listed

No HIFLD substation record has this name in this county.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line (West Circuit)
Rebuild the 9.03-mile west circuit of Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line
ERCOT project 110573 · utility no. R8846
ONCOR
Tier 4
Conceptual
Future tab
138 Dec 2029 Buford (fka China Grove) Switch to Barber Lake Switch Buford (fka China Grove) Switch, Barber Lake Switch
Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line (East Circuit)
Rebuild the 9.03-mile east circuit of Buford (fka China Grove) Switch - Barber Lake Switch 138 kV Line
ERCOT project 110579 · utility no. R8845
ONCOR
Tier 4
Conceptual
Future tab
138 Dec 2029 Buford (fka China Grove) Switch to Barber Lake Switch Buford (fka China Grove) Switch, Barber Lake Switch

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110573First listedon the Future tab
July 13, 2026110579First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.