Alsatian
Named in 1 listed project in ERCOT’s transmission project tracking workbook. First named in the release with data as of July 13, 2026.
Described as new. The quoted wording calls this substation new. “new STEC-owned Alsatian 345/138kV station” — project 110523 description, as the utility reported it
No HIFLD substation record has this name in this county.
Location
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Note: Option still under ERCOT review: the July 2026 update is a draft and lists the Alsatian station in STEC's Option 2 and in ERCOT's Option 3 (which would install four autotransformers), with CPS alternatives (Options 4-7) still being evaluated. TPIT status Conceptual, ISD 2029-07. OSM tags Bader as 69 kV only, while ERCOT calls the corridor 'Bader to Pearson 138 kV'. Capacitor sizes differ (TPIT 385 MVAR; ERCOT Option 2 162 MVAr).
Sources: ERCOT status update (draft), combined CPS Energy Large Load Additions (25RPG020) and STEC Medina County Large Load (25RPG046) projects, RPG July 2026 (2026-07-17), pp.7, 16, 36 · OpenStreetMap: STEC Bader and Pearson substations (OSM base 2026-11-20) · ERCOT TPIT, project 110523 (release 39, 2026-10-01). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| STEC Rogers Large Load addition Phase 1 -Install a new 385 MVAR capacitor bank on the 138kV side of the new STEC-owned Alsatian 345/138kV station -Add the second 138kV ckt along the existing Legend Falls to STEC Castroville corridor: Legend Falls - San Geronimo, San Geronimo - Rio Medina, Rio Medina - Castroville, with a 426/474 MVA rating -Add the 2nd ckt to existing Pearson to Castroville corridor: Pearson - Dunlay, Dunlay-new STEC Al… ERCOT project 110523 · RPG 25RPG046 |
STEC Tier 1 |
Conceptual Future tab |
138 | Jul 2029 | No terminals printed | Alsatian |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110523 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.