Woodring substation interconnection queue

2 active projects totaling 426 MW in the SPP queue, plus 1 with terminal status (shown grayed).

3 SPP queue filings name Woodring as the point of interconnection, all in OK.

2active projects
426active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-005 Not reported 345 500 Solar Withdrawn
GEN-2016-068 Not reported 345 250 Wind Operational
GEN-2016-128 Not reported 345 176 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.