Wolf Creek - Blackberry Line substation interconnection queue

3 active projects totaling 749.8 MW in the SPP queue.

3 SPP queue filings name Wolf Creek - Blackberry Line as the point of interconnection, all in KS.

3active projects
749.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-258 Not reported 345 300 Wind Active
GEN-2024-139 Not reported 345 250 Solar Active
GEN-2024-287 Not reported 345 199.8 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.