Wakefield substation interconnection queue

2 active projects totaling 320 MW in the SPP queue.

2 SPP queue filings name Wakefield as the point of interconnection, all in NE.

2active projects
320active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2010-051 Not reported 230 200 Wind Operational
GEN-2011-027 Not reported 230 120 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.