Substation Scout

Wagener Substation substation interconnection queue

2 active projects totaling 300 MW in the SPP queue.

2 SPP queue filings name Wagener Substation as the point of interconnection, all in Lancaster County, NE.

2active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-049 Not reported 115 225 Solar Active
GEN-2021-048 Not reported 115 75 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.