Tuco to Yoakum line substation interconnection queue

1 active project totaling 352.5 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3 SPP queue filings name Tuco to Yoakum line as the point of interconnection, all in TX.

1active projects
352.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-068 Not reported 345 400 Solar Withdrawn
GEN-2020-067 Not reported 345 352.5 Wind Active
GEN-2020-066 Not reported 345 253.8 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.