Substation Scout

Tuco - Carlisle line substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Tuco - Carlisle line as the point of interconnection, all in Hale County, TX.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-082 Not reported 230 180 Solar Withdrawn
GEN-2023-008 Not reported 230 75 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first