Tolk substation substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

4 SPP queue filings name Tolk substation as the point of interconnection, all in TX.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-080 Not reported 230 525 Solar Withdrawn
GEN-2018-124 Not reported 230 200 Solar Withdrawn
GEN-2018-112 Not reported 230 185 Solar Withdrawn
GEN-2018-111 Not reported 230 75 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.