Substation Scout

Tie Substation substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Tie Substation as the point of interconnection, all in Cowley County, KS.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-041 Not reported 69 100 Solar Withdrawn
GEN-2023-121 Not reported 69 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first