Substation Scout

Thistle substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3 SPP queue filings name Thistle as the point of interconnection, all in KS.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-049 Not reported 345 200 Wind Withdrawn
GEN-2011-043 Not reported 345 150 Wind Withdrawn
GEN-2011-044 Not reported 345 150 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first