Substation Scout

Thistle-Wichita Dbl Ckt (Buffalo Flats) substation interconnection queue

3 active projects totaling 465 MW in the SPP queue, plus 1 with terminal status (shown grayed).

4 SPP queue filings name Thistle-Wichita Dbl Ckt (Buffalo Flats) as the point of interconnection, all in KS.

3active projects
465active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-024 Not reported 345 220 Wind Operational
GEN-2015-090 Not reported 345 220 Wind Operational
GEN-2016-073 Not reported 345 220 Wind Withdrawn
GEN-2019-001 Not reported 345 25 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.