Texas County substation interconnection queue

1 active project totaling 102.6 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Texas County as the point of interconnection, all in Texas County, OK.

1active projects
102.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-100 Not reported 115 102.6 Solar Active
GEN-2017-162 Not reported 115 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.