Tap Tolk - Eddy County (Crossroads) substation interconnection queue
0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2014-062 | Not reported | 345 | 200.1 | Wind | Withdrawn |
| GEN-2014-047 | Not reported | 345 | 40 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.