Substation Scout

Tap Tolk - Eddy County (Crossroads) substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-062 Not reported 345 200.1 Wind Withdrawn
GEN-2014-047 Not reported 345 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first