Tap on the Mullen Creek to Ketchum Line substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Tap on the Mullen Creek to Ketchum Line as the point of interconnection, all in Andrew County, MO.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-209 Not reported 345 600 Hybrid Withdrawn
GEN-2022-208 Not reported 345 400 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.