Tap Nekoma - Bazine (Walnut Creek) substation interconnection queue

2 active projects totaling 50.7 MW in the SPP queue.

2 SPP queue filings name Tap Nekoma - Bazine (Walnut Creek) as the point of interconnection, all in Rush County, KS.

2active projects
50.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-020 Not reported 69 48.3 Wind Operational
GEN-2014-025 Not reported 69 2.4 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.