Substation Scout

Tap Medford Tap – Coyote substation interconnection queue

2 active projects totaling 204.6 MW in the SPP queue.

2 SPP queue filings name Tap Medford Tap – Coyote as the point of interconnection, all in OK.

2active projects
204.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-015 Not reported 138 154.6 Wind Operational
GEN-2024-SR17 Not reported 138 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.