0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Tap Fort Randall - Columbus (Madison County) as the point of interconnection, all in Antelope County, NE.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2013-005 Not reported 230 73.5 Wind Withdrawn
GEN-2013-004 Not reported 230 6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.