Tap between SW Shreveport to Dolet Hills Substations substation interconnection queue
0 active projects
totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2 SPP queue filings name Tap between SW Shreveport to Dolet Hills Substations as the point of interconnection, all in Desoto Parish, LA.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2022-108
Not reported
345
100
Solar
Withdrawn
GEN-2023-030
Not reported
345
25
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.