Sweetwater substation interconnection queue

5 active projects totaling 537.9 MW in the SPP queue, plus 2 with terminal status (shown grayed).

5active projects
537.9active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-001 Not reported 345 250 Wind Withdrawn
GEN-2016-074 Not reported 345 200 Wind Active
GEN-2018-117 Not reported 230 150 Solar Withdrawn
GEN-2006-035 Not reported 230 132 Wind Operational
GEN-2006-002 Not reported 230 100.8 Wind Operational
GEN-2006-043 Not reported 230 99 Wind Operational
GEN-2016-132 Not reported 230 6.1 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.