Substation Scout

Sunnyside substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

4 SPP queue filings name Sunnyside as the point of interconnection, all in OK.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-166 Not reported 345 250 Solar Withdrawn
GEN-2008-046 Not reported 345 200 Wind Withdrawn
GEN-2011-013 Not reported 345 101.7 Wind Withdrawn
GEN-2017-167 Not reported 345 52 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first