Summit Substation substation interconnection queue

1 active project totaling 200 MW in the SPP queue, plus 1 with terminal status (shown grayed).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-175 Not reported 161 200 Battery Active
GEN-2018-007 Not reported 115 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.