Steele City substation interconnection queue

4 active projects totaling 128.8 MW in the SPP queue.

4 SPP queue filings name Steele City as the point of interconnection, all in Jefferson County, NE.

4active projects
128.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2011-018 Not reported 115 73.6 Wind Operational
GEN-2023-SR19 Not reported 115 50 Battery Active
GEN-2014-004 Not reported 115 4 Wind Operational
GEN-2013-008 Not reported 115 1.2 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.