Spring Creek-Sooner substation interconnection queue

1 active project totaling 600 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3 SPP queue filings name Spring Creek-Sooner as the point of interconnection, all in OK.

1active projects
600active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-119 Not reported 345 600 Wind Active
GEN-2016-101 Not reported 345 195 Wind Withdrawn
GEN-2016-100 Not reported 345 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.