Spearville substation interconnection queue

2 active projects totaling 252.5 MW in the SPP queue, plus 5 with terminal status (shown grayed).

7 SPP queue filings name Spearville as the point of interconnection, all in KS.

2active projects
252.5active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2010-029 Not reported 345 450 Wind Withdrawn
GEN-2012-042 Not reported 345 220 Gas Withdrawn
GEN-2006-006 Not reported 345 205.5 Wind Withdrawn
GEN-2010-015 Not reported 345 200.1 Wind Withdrawn
GEN-2007-038 Not reported 345 200 Wind Withdrawn
GEN-2004-014 Not reported 230 152 Wind Operational
GEN-2002-025A Not reported 230 100.5 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.