Substation Scout

Spalding to North Loup substation interconnection queue

2 active projects totaling 185 MW in the SPP queue.

2 SPP queue filings name Spalding to North Loup as the point of interconnection, all in Greeley County, NE.

2active projects
185active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-234 Not reported 115 115 Wind Active
GEN-2024-SR8 Not reported 115 70 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first