South Foreman - Patterson line substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name South Foreman - Patterson line as the point of interconnection, all in Little River County, AR.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-045 Not reported 138 200 Battery Withdrawn
GEN-2022-047 Not reported 138 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.