Substation Scout

Smoky Hills Tap substation interconnection queue

1 active project totaling 249.3 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Smoky Hills Tap as the point of interconnection, all in KS.

1active projects
249.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2003-019 Not reported 230 249.3 Wind Operational
GEN-2021-013 Not reported 230 74.9 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.