Shell Creek-Hoskins Line substation interconnection queue
0 active projects
totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).
4 SPP queue filings name Shell Creek-Hoskins Line as the point of interconnection, all in Madison County, NE.
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2021-058
Not reported
345
300
Wind
Withdrawn
GEN-2019-069
Not reported
345
100
Solar
Withdrawn
GEN-2019-073
Not reported
345
100
Solar
Withdrawn
GEN-2019-070
Not reported
345
50
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.