Substation Scout

Setab Substation substation interconnection queue

4 active projects totaling 1,300 MW in the SPP queue, plus 6 with terminal status (shown grayed).

10 SPP queue filings name Setab Substation as the point of interconnection, all in Scott County, KS.

4active projects
1,300active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-136 Not reported 345 400 Solar Active
GEN-2024-137 Not reported 345 300 Wind Active
GEN-2024-138 Not reported 345 300 Wind Active
GEN-2024-144 Not reported 345 300 Wind Active
GEN-2023-045 Not reported 345 250 Wind Withdrawn
GEN-2023-046 Not reported 345 250 Wind Withdrawn
GEN-2023-047 Not reported 345 250 Wind Withdrawn
GEN-2023-048 Not reported 345 250 Wind Withdrawn
GEN-2023-043 Not reported 345 200 Solar Withdrawn
GEN-2023-044 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.