Russell Substation substation interconnection queue
1 active project totaling 20 MW in the SPP queue, plus 2 with terminal status (shown grayed).
1active projects
20active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-003 | Not reported | 138 | 125 | Solar | Withdrawn |
| GEN-2024-086 | Not reported | 138 | 120 | Solar | Withdrawn |
| GEN-2020-056 | Not reported | 115 | 20 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.