Substation Scout

Russell Substation substation interconnection queue

1 active project totaling 20 MW in the SPP queue, plus 2 with terminal status (shown grayed).

1active projects
20active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-003 Not reported 138 125 Solar Withdrawn
GEN-2024-086 Not reported 138 120 Solar Withdrawn
GEN-2020-056 Not reported 115 20 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first