Roadrunner substation interconnection queue

1 active project totaling 110 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3 SPP queue filings name Roadrunner as the point of interconnection, all in Lea County, NM.

1active projects
110active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2014-030 Not reported 345 150 Solar Withdrawn
GEN-2017-145 Not reported 115 110.3 Solar Withdrawn
GEN-2016-121 Not reported 115 110 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.