Riverside Substation substation interconnection queue
9 active projects totaling 1,900 MW in the SPP queue, plus 5 with terminal status (shown grayed).
14 SPP queue filings name Riverside Substation as the point of interconnection, all in Texas County, OK.
9active projects
1,900active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2016-141 | Not reported | 345 | 350 | Wind | Active |
| GEN-2016-142 | Not reported | 345 | 350 | Wind | Active |
| GEN-2016-133 | Not reported | 345 | 187.5 | Wind | Active |
| GEN-2016-134 | Not reported | 345 | 187.5 | Wind | Active |
| GEN-2016-137 | Not reported | 345 | 187.5 | Wind | Active |
| GEN-2016-138 | Not reported | 345 | 187.5 | Wind | Active |
| GEN-2016-143 | Not reported | 345 | 175 | Wind | Withdrawn |
| GEN-2016-144 | Not reported | 345 | 175 | Wind | Withdrawn |
| GEN-2016-145 | Not reported | 345 | 175 | Wind | Active |
| GEN-2016-146 | Not reported | 345 | 175 | Wind | Active |
| GEN-2016-135 | Not reported | 345 | 100 | Wind | Withdrawn |
| GEN-2016-139 | Not reported | 345 | 100 | Wind | Active |
| GEN-2016-136 | Not reported | 345 | 75 | Wind | Withdrawn |
| GEN-2016-140 | Not reported | 345 | 75 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.