Reno - Summit substation interconnection queue

1 active project totaling 302 MW in the SPP queue, plus 3 with terminal status (shown grayed).

4 SPP queue filings name Reno - Summit as the point of interconnection, all in KS.

1active projects
302active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-114 Not reported 345 310 Wind Withdrawn
GEN-2016-111 Not reported 345 302 Wind Active
GEN-2016-122 Not reported 345 225 Wind Withdrawn
GEN-2016-112 Not reported 345 220 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.