Substation Scout

Potter Substation substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 7 with terminal status (shown grayed).

7 SPP queue filings name Potter Substation as the point of interconnection, all in Oldham County, TX.

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-116 Not reported 345 250 Wind Withdrawn
GEN-2022-117 Not reported 345 250 Wind Withdrawn
GEN-2022-118 Not reported 345 250 Wind Withdrawn
GEN-2022-119 Not reported 345 250 Wind Withdrawn
GEN-2022-120 Not reported 345 250 Wind Withdrawn
GEN-2022-121 Not reported 345 250 Wind Withdrawn
GEN-2022-122 Not reported 345 250 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first