Potter Substation substation interconnection queue
0 active projects totaling 0 MW in the SPP queue, plus 7 with terminal status (shown grayed).
7 SPP queue filings name Potter Substation as the point of interconnection, all in Oldham County, TX.
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-116 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-117 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-118 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-119 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-120 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-121 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-122 | Not reported | 345 | 250 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.
Site Scanner