1 active project totaling 161 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3 SPP queue filings name Potter County as the point of interconnection, all in TX.

1active projects
161active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-051 Not reported 345 161 Wind Operational
GEN-2019-036 Not reported 230 70 Solar Withdrawn
GEN-2019-038 Not reported 230 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.