Pleasant Hill Substation substation interconnection queue
1 active project totaling 280 MW in the SPP queue, plus 3 with terminal status (shown grayed).
1active projects
280active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-170 | Not reported | 345 | 280 | Battery | Active |
| GEN-2022-164 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2022-171 | Not reported | 230 | 200 | Wind | Withdrawn |
| GEN-2024-353 | Not reported | 230 | 199 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.