Pleasant Hill Substation substation interconnection queue

1 active project totaling 280 MW in the SPP queue, plus 3 with terminal status (shown grayed).

1active projects
280active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-170 Not reported 345 280 Battery Active
GEN-2022-164 Not reported 345 200 Battery Withdrawn
GEN-2022-171 Not reported 230 200 Wind Withdrawn
GEN-2024-353 Not reported 230 199 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.