Oklaunion-Tuco Line Break substation interconnection queue
0 active projects totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).
5 SPP queue filings name Oklaunion-Tuco Line Break as the point of interconnection, all in TX.
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2018-092 | Not reported | 345 | 400 | Solar | Withdrawn |
| GEN-2018-091 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2022-242 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2022-243 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2022-244 | Not reported | 345 | 200 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.