Oklaunion-Tuco Line Break substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).

5 SPP queue filings name Oklaunion-Tuco Line Break as the point of interconnection, all in TX.

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-092 Not reported 345 400 Solar Withdrawn
GEN-2018-091 Not reported 345 250 Battery Withdrawn
GEN-2022-242 Not reported 345 250 Battery Withdrawn
GEN-2022-243 Not reported 345 200 Solar Withdrawn
GEN-2022-244 Not reported 345 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.