Substation Scout

Northeastern Substation substation interconnection queue

1 active project totaling 510 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3 SPP queue filings name Northeastern Substation as the point of interconnection, all in Rogers County, OK.

1active projects
510active MW
3total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-023 Not reported 345 510 Gas Active
GEN-2024-087 Not reported 345 510 Gas Withdrawn
GEN-2023-103 Not reported 138 200 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.