Substation Scout

New GGS Satellite Substation substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3 SPP queue filings name New GGS Satellite Substation as the point of interconnection, all in Lancaster County, NE.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-210 Not reported 345 240 Hybrid Withdrawn
GEN-2022-212 Not reported 345 225 Hybrid Withdrawn
GEN-2022-211 Not reported 345 175 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first