Substation Scout

Neosho-Delaware substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-092 Not reported 345 299.2 Wind Withdrawn
GEN-2020-052 Not reported 345 251 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.