0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Needmore - Yoakum Line as the point of interconnection, all in Bailey County, TX.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-158 Not reported 230 335 Solar Withdrawn
GEN-2023-159 Not reported 230 170 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.