Mustang substation interconnection queue

6 active projects totaling 370 MW in the SPP queue, plus 4 with terminal status (shown grayed).

6active projects
370active MW
10total filed
Queue IDProjectkVMWResourceStatus
GEN-2011-048 Not reported 230 175 Gas Operational
GEN-2006-015 Not reported 230 150 Gas Operational
GEN-2015-040 Not reported 230 50.1 Solar Withdrawn
GEN-2015-078 Not reported 115 50.1 Solar Withdrawn
GEN-2016-047 Not reported 69 24 Gas Operational
GEN-2012-009 Not reported 230 15 Gas Withdrawn
GEN-2012-010 Not reported 230 15 Gas Withdrawn
GEN-2012-034 Not reported 230 7 Gas Operational
GEN-2012-035 Not reported 230 7 Gas Operational
GEN-2012-036 Not reported 230 7 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.