Murray Gill Substation substation interconnection queue

2 active projects totaling 308 MW in the SPP queue, plus 1 with terminal status (shown grayed).

3 SPP queue filings name Murray Gill Substation as the point of interconnection, all in Sedgwick County, KS.

2active projects
308active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-166 Not reported 138 275 Hybrid Active
GEN-2023-186 Not reported 138 200 Hybrid Withdrawn
GEN-2022-004 Not reported 138 33 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.