Mullen Creek-Sibley (Ketchum) substation interconnection queue

1 active project totaling 200.1 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Mullen Creek-Sibley (Ketchum) as the point of interconnection, all in Dekalb County, MO.

1active projects
200.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-005 Not reported 345 200.1 Wind Operational
GEN-2016-088 Not reported 345 151.2 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.