Monolith substation interconnection queue
3 active projects totaling 204.2 MW in the SPP queue.
3 SPP queue filings name Monolith as the point of interconnection, all in Lancaster County, NE.
3active projects
204.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2024-SR10 | Not reported | 115 | 80 | Battery | Active |
| GEN-2013-019 | Not reported | 115 | 73.6 | Solar | Active |
| GEN-2013-002 | Not reported | 115 | 50.6 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.