Monolith substation interconnection queue

3 active projects totaling 204.2 MW in the SPP queue.

3 SPP queue filings name Monolith as the point of interconnection, all in Lancaster County, NE.

3active projects
204.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-SR10 Not reported 115 80 Battery Active
GEN-2013-019 Not reported 115 73.6 Solar Active
GEN-2013-002 Not reported 115 50.6 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.