Minco Substation substation interconnection queue

1 active project totaling 200 MW in the SPP queue, plus 5 with terminal status (shown grayed).

6 SPP queue filings name Minco Substation as the point of interconnection, all in OK.

1active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
GEN-2025-SR6 Not reported 345 200 Battery Active
GEN-2024-172 Not reported 345 190 Battery Withdrawn
GEN-2022-SR4 Not reported 345 85 Battery Withdrawn
GEN-2023-SR2 Not reported 345 85 Battery Withdrawn
GEN-2015-044 Not reported 345 20 Battery Withdrawn
GEN-2015-059 Not reported 345 6.3 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.