Substation Scout

Midland substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

4 SPP queue filings name Midland as the point of interconnection, all in TX.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2010-060 Not reported 345 992 Gas Withdrawn
GEN-2009-007 Not reported 345 550 Gas Withdrawn
GEN-2010-059 Not reported 345 516 Gas Withdrawn
GEN-2011-031 Not reported 230 195.6 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first