Meadow Grove substation interconnection queue

4 active projects totaling 320.5 MW in the SPP queue.

4 SPP queue filings name Meadow Grove as the point of interconnection, all in Antelope County, NE.

4active projects
320.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-086N02 Not reported 230 201 Wind Operational
GEN-2014-013 Not reported 230 73.5 Wind Operational
GEN-2014-031 Not reported 230 35.8 Wind Operational
GEN-2014-032 Not reported 230 10.2 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.