Mahoney Substation substation interconnection queue

3 active projects totaling 850 MW in the SPP queue, plus 1 with terminal status (shown grayed).

4 SPP queue filings name Mahoney Substation as the point of interconnection, all in Yoakum County, TX.

3active projects
850active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-239 Not reported 230 300 Solar Active
GEN-2024-SR15 Not reported 230 300 Battery Active
GEN-2024-SR4 Not reported 230 300 Battery Withdrawn
ERAS-2025-027 Not reported 230 250 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.